Sunday, 30 August 2015

A Lick of Paint

The waterline was taped up and Betsy has now had two coats of two part epoxy based primer.


The dog house has had a fill and fair, having been tabbed to the coach roof.


After a vacuum and a wipe round with acetone, the same two part epoxy primer was rolled on.



Following the dry fit earlier in the week, I have filleted the first two panels of the main stowage compartments whilst holding it all square to the bulkhead with an assortment of clamps.


No comments: